Risk Management System

One governed enterprise risk register using an approved methodology and auditable history

RMS provides a governed enterprise risk register with lifecycle control, configurable assessment matrices, multidimensional consequence modelling, facilitated workshops, control-effectiveness records and reports frozen at issue.

0
Lifecycle states
0
Workshop depths
0
Organisation levels
0
Loadable datasets
Two common ways risk reporting can mislead

Unrated is distinct from low; untested is distinct from effective

RMS keeps unrated risks and controls without effectiveness evidence explicitly visible rather than treating them as low risk or effective.

Unrated risks remain visible in reporting

Risks without approved assessments are reported as unrated and remain visible in exposure reporting rather than being excluded.

Control assurance is distinct from control count

Control design weakness, operating ineffectiveness, unassessed status and open deficiencies are maintained as distinct assurance positions.

The register

Current and residual ratings remain blank where no approved assessment exists

One enterprise register covers strategic, corporate, project, operational, engineering, financial, compliance, sustainability and cyber risk under a common approved methodology.

RMS risk register showing enterprise risks across their lifecycle, including current and residual ratings, next review dates and explicit identification of risks that have no approved assessment rather than treating them as low or excluding them.

Where no approved assessment exists, rating fields remain blank so missing assessment is not confused with low risk.

  • One approved methodology
    Ratings across the register use the same configured matrix so workshop and board-report ratings remain consistent.
  • Consequence is multidimensional
    Safety, environmental, financial, reputational and other consequence dimensions are assessed separately before combined rating logic is applied.
  • Review is
    time-bound. Overdue reviews are reported explicitly so the currency of the risk register remains visible.
The lifecycle

Risk ratings become authoritative when the assessment is approved

Risk ratings are assigned only after approved assessment. Until then, the risk remains unrated and visible on the register.

Risk
Draft
Identified
Under assessment
Approved
Active
Closed
Returned to owner
Controls

Control effectiveness depends on evidence of implementation and verification

Bow-tie analysis identifies threats, preventive controls, top events, recovery controls and consequences together with available effectiveness evidence.

Equipment failure
Process deviation
Third-party action
Human factor
Safety
Environment
Financial
Reputation
Design
Procedure
Monitoring
Competence
Detection
Mitigation
Recovery
Top event
  • Unrated remains distinct from low

    Risks without approved assessments are reported as unrated rather than low and remain included in exposure reporting.

  • Design effectiveness is separate from operating effectiveness

    Controls can be well designed yet ineffective in operation, or operationally effective despite design weaknesses. RMS records design and operating effectiveness separately.

  • Issued reports are frozen at issue

    Issued reports are frozen so historical board packs continue to show the risk position reported at the time.

  • Corrections are appended rather than overwritten

    Corrections append new records rather than rewriting prior history, preserving the position that existed when earlier decisions were made.

Capability architecture

Enterprise risk operations, workshops, controls and reporting knowledge and governance.

RMS navigation reflects enterprise-risk workflows while maintaining product boundaries with specialist applications.

  • Risk operations

    Risks move through a ten-state lifecycle against configurable matrices and retain treatments, actions, reviews and governance status.

    • Risk operations
    • Risk register
    • Assessments
    • Treatments
    • Reviews
  • Workshops

    Governed workshops progress through preparation, pre-pack, facilitated session, outcomes and review so approved conclusions enter the enterprise register with methodology and evidence retained.

    • Workshops
    • Preparation
    • Pre-pack
    • Session
    • Outcomes
  • Controls

    A control register where design effectiveness and operating effectiveness are recorded separately, with barrier models, deficiencies, and key risk, control and performance indicators against thresholds.

    • Controls
    • Control register
    • BowTie
    • Deficiencies
    • Indicators
  • Risk knowledge

    Reusable risk archetypes, risk breakdown structures and risk packs allow new projects to begin from existing organisational knowledge.

    • Risk knowledge
    • Archetypes
    • Risk breakdown structure
    • Risk packs
    • Knowledge library
  • Governance

    Risk appetite, tolerance, escalation thresholds, enterprise objectives, organisation hierarchy and review calendar form the core governance configuration.

    • Governance
    • Appetite and tolerance
    • Objectives
    • Organisation
    • Calendar
  • Analytics and reporting

    Analytics, enterprise search and reports operate over governed records, with data management, integrations and append-only audit history supporting traceability.

    • Analytics
    • Reports
    • Enterprise search
    • Data management
    • Integrations
From workshop to board reporting

Workshop conclusions become governed register records

Facilitated workshops progress through preparation, pre-pack, session, outcomes and review, with approved conclusions entered into the register and issued reports retained as dated records.

  • Reusable archetypes and a risk breakdown structure provide a governed starting point for new workshops
  • Appetite, tolerance and escalation thresholds are configured and applied consistently
  • Reports are frozen at issue and corrections are appended rather than overwritten
Preview before commit

Imports remain uncommitted until preview is accepted

Import, bulk update, historical migration, export, templates and extract functions state supported and unsupported operations explicitly, with historical migration preserving original effective dates.

  • Twenty-six loadable datasets across business areas
  • Templates use organisation-defined allowed values
  • Complete organisation extract
Also in RMS

More of what the application covers

  • Configurable matrices with a multidimensional consequence model
  • Appetite, tolerance and escalation thresholds
  • Eleven-level organisation structure
  • Risk archetypes and a risk breakdown structure
  • Key risk, control and performance indicators against thresholds
  • Risk 360 view covering assessments, controls, treatments, actions, reviews and timeline
  • Validated import and export with preview before commit
  • Append-only audit history behind governed changes
RMS

Review RMS using one of your enterprise risk registers

Bring one risk register and one recent workshop. The demonstration will show the governed lifecycle, control-assurance position and resulting board-report record.