Zemerc application walkthroughs and demonstrations.
Written and visual walkthroughs of application records, controls, derived positions and defined limitations, with recorded material shown where available.
- 30
- Tours
- 27
- Applications
- 8
- Operating areas
- 8
- Tour types
Featured tours
All 30 tours- PDMSApplication overviewComing soonOpen tour entry: Project Delivery Management System application overview.PDMS: Project Delivery Management System
Project Delivery Management System application overview.
Portfolio governance, project workspaces and stage gates are driven by the governed registers beneath them.
ProjectsOpen tour entry - AIRMS: Asset Integrity & Reliability Management System
Barrier assurance from performance standard to restoration
A barrier is assured through completed and verified activities, not by policy statements alone.
AssetsOpen tour entry - HAMS: Hydrocarbon Accounting Management System
Period close: validated, allocated and reconciled
Every reported quantity remains traceable to the reading and governed calculation that produced it.
ProductionOpen tour entry
30 tour entries across 27 applications.
Filter by application, operating area or tour type. Each tour entry has its own page describing the subject and linking to related written guidance.
Showing 30 tours in the library
- PDMSApplication overviewComing soonOpen tour entry: Project Delivery Management System application overview.PDMS: Project Delivery Management System
Project Delivery Management System application overview.
Portfolio governance, project workspaces and stage gates are driven by the governed registers beneath them.
ProjectsOpen tour entry - AIRMS: Asset Integrity & Reliability Management System
Barrier assurance from performance standard to restoration
A barrier is assured through completed and verified activities, not by policy statements alone.
AssetsOpen tour entry - HAMS: Hydrocarbon Accounting Management System
Period close: validated, allocated and reconciled
Every reported quantity remains traceable to the reading and governed calculation that produced it.
ProductionOpen tour entry - RMS: Risk Management System
Risk Management System: application overview
One enterprise risk register from facilitated workshop through control-effectiveness assurance.
Safety & RiskOpen tour entry - RMSFeature walkthroughComing soonOpen tour entry: Bow-tie analysis: threats, controls and consequencesRMS: Risk Management System
Bow-tie analysis: threats, controls and consequences
Building a bow-tie view that remains traceable to the underlying risk register.
Safety & RiskOpen tour entry - EAMS: Enterprise Asset Management System
Preventive maintenance driven by meter readings
Work-order completion and closure are distinct governed actions.
AssetsOpen tour entry - CCMSApplication overviewComing soonOpen tour entry: The completion chain from inspection record to handover certificateCCMS: Completion, Commissioning & Handover Management System
The completion chain from inspection record to handover certificate
Gate release depends on completed deliverables and required evidence, not on a percentage alone.
CompletionsOpen tour entry - PMS: Procurement Management System
Sealed tendering from requisition to award
Submissions remain unreadable until the authorised opening action occurs.
Supply chainOpen tour entry - QMS: Quality Management System
Non-conformance to corrective action.
Technical disposition, corrective action and effectiveness review before closure where applicable.
CompletionsOpen tour entry - HSE: Health, Safety & Environment Management System
Reporting an incident from the field
The record receives a permanent identifier and follows the governed HSE workflow from initial report through assessment and action.
Safety & RiskOpen tour entry - HSE: Health, Safety & Environment Management System
Safety figures with a recorded basis
Recordable and lost-time rates are calculated from recorded hours and are not estimated where the required basis is absent.
Safety & RiskOpen tour entry - ESG: Environmental, Social & Governance Management System
Disclosure derived from the operating record
Sustainability reporting and operational reporting draw from the same governed source where the underlying record is shared.
GovernanceOpen tour entry - OMSData managementComing soonOpen tour entry: Obsolescence lifecycle status derived from verified evidence, with unknown retained as an explicit resultOMS: Obsolescence Management System
Obsolescence lifecycle status derived from verified evidence, with unknown retained as an explicit result
Unknown is an explicit lifecycle result and is not the same as active.
AssetsOpen tour entry - FAMS: Flow Assurance Management System
The production network as one structural model
Production-network hierarchy from business unit to individual well down to the individual well, in one hierarchy.
ProductionOpen tour entry - IMSApplication overviewComing soonOpen tour entry: Building a management system that can be operatedIMS: Integrated Management System
Building a management system that can be operated
Understand the organisation, establish the system and operate it as a governed working structure rather than a static document.
GovernanceOpen tour entry - PSM: Process Safety Management System
The index this application does not produce.
Where no approved engineering method exists, the application reports the limitation rather than producing an unsupported number.
Safety & RiskOpen tour entry - CVMS: Contractor / Vendor Management System
Supplier compliance derived from the evidence held.
Expired evidence, missing evidence and overdue renewals are calculated positions, not manually selected status labels.
Supply chainOpen tour entry - CCMS: Completion, Commissioning & Handover Management System
Configuring a completions project
The certificate sequence is established for the project and then controlled against the approved configuration.
CompletionsOpen tour entry - BCMS: Budget & Cost Management System
The cost chain from estimate through close-out, with
Each financial step retains the approved figure and the authority behind it.
ProjectsOpen tour entry - EDMS: Enterprise Document Management System
Superseded rather than overwritten
A transmittal issued previously remains linked to the exact revision it carried.
GovernanceOpen tour entry - VMT: Vessel Management Tracker
One vessel day from deck activity to the commercial record
With daily operational evidence supporting downtime and the resulting commercial position.
OffshoreOpen tour entry - OPEPApplication overviewComing soonOpen tour entry: Offshore execution from fabrication through commissioningOPEP: Offshore Projects Execution Platform
Offshore execution from fabrication through commissioning
The project lifecycle remains governed as one connected record from yard activity to final handover.
OffshoreOpen tour entry - OPMS: Offshore Projects Management System
Daily field input to portfolio consolidation
Management reporting is derived from the operational records captured by the field team.
OffshoreOpen tour entry - IFMS: Interface Management System
An interface, from raised to closed
Two parties, one agreed interface and accountable ownership against a required date.
ProjectsOpen tour entry - CMS: Contracts Management System
From obligation to payment certificate
The contract lifecycle remains traceable from each claim back to the clause and evidence that support it.
Supply chainOpen tour entry - LGMS: Logistics Management System
Planning a movement and comparing options
Scenarios are evaluated side by side, including the applicable marine and berth checks.
Supply chainOpen tour entry - SPIR: Spare parts Interchangeability Record Management System
Spares, transmittals and the digital handover record
The receiving organisation can see what was transferred and the evidence that confirms receipt.
CompletionsOpen tour entry - RAMS: Reliability, Availability & Maintainability Management System
Quantitative reliability, and what it will not assert
Analysis performed on recorded history, with result limitations stated explicitly.
AssetsOpen tour entry - TSM: Technical Safety Management System
The safety case and its safety-critical elements
Hazards, barriers, performance standards and supporting evidence are governed as one connected assurance structure.
Safety & RiskOpen tour entry - LLMS: Lessons Learned Management System
A lesson from capture to reuse
The review, approval, publication and periodic-review stages remain visible throughout the knowledge lifecycle.
GovernanceOpen tour entry
Four questions covered by every tour.
Tours use the same editorial standard as application guides so record scope, controls, derived positions and limitations remain consistent.
- 01
Governed engineering record
The class of industrial record the application governs and the team accountable for it.
- 02
The controls applied to it
Where approval is segregated, records become immutable or the application blocks an unsupported action.
- 03
What it derives and from which records
Displayed figures should remain traceable to the supporting records, while unavailable calculations are identified explicitly.
- 04
Where it stops
What the application deliberately does not do and where a related record may cross into another independently operable application.
8 tour types selected according to application context.
Not every application requires every tour type. The governed workflow determines which views are useful.
- Application overview
- An application overview covering its governed record, workflow, controls and boundaries.
- Workflow
- A governed sequence from initiation to closure, showing the controls applied at each stage.
- Reporting
- How a figure is produced, what it counts, what it excludes and what the application deliberately does not calculate.
- Feature walkthrough
- One capability examined in depth for users already familiar with RMS.
- Getting started
- How the application is configured around your own records and controls.
- Dashboard
- The view a lead user is likely to open first and the records supporting its principal figures.
- Data management
- How records are created, corrected, superseded and retained, including the provenance preserved when values change.
- Administration
- Roles, approval routes, templates and configuration that translate approved project rules into application controls.
Beyond the tours.
All 27 applications across 8 operating areas. Every one has a written guide with its own screens, and any of them can be shown against your records.
See an application demonstrated against representative records.
A tour explains how the application works. A working session assesses it against representative client records.